summaryrefslogtreecommitdiff
path: root/assignment3
diff options
context:
space:
mode:
Diffstat (limited to 'assignment3')
-rw-r--r--assignment3/background.tex16
1 files changed, 6 insertions, 10 deletions
diff --git a/assignment3/background.tex b/assignment3/background.tex
index 5327fda..2559506 100644
--- a/assignment3/background.tex
+++ b/assignment3/background.tex
@@ -22,19 +22,15 @@ whether a resource consent is required, the applicant is to prepare a
thorough assessment of environmental effects (AEE). Although it might
be beneficial to consult with possibly affected people and interested
members of the general public at this stage, consultation is not a
-general requirement under the RMA.
-
-% TODO
-- EIA in NZ differs from international best practice, because
- consultation before the application is lodged is not required
-
-- consultation may be required by another Act; consultation with Maori
- (if affected) is usually required due to Treaty
+general requirement under the RMA. However, consultation may be the
+best means to comply with those sections of the RMA that require the
+recognition of the interest of \emph{tangata whenua}, for example,
+when a development proposal affects locations or resources that are of
+special interest to the Maori \parencite{ME960}.
+% TODO:
- any results of consultation must be included in the AEE
-refer to http://www.mfe.govt.nz/publications/rma/everyday/consent-consultation/
-
\subsection{Review and notification}